17
Details up front: 98.8% · lot-specific certificate.
This is presented as though it settles something, and I am not convinced it does.
I have two documents that appear to disagree, which is what prompted this.
What is the correct interpretation, and what is the common misreading?
shareeditfollowflag
Is there a reason to prefer the second method over the first, other than cost? – Dr_Rosalind_Achebe 8 months ago
add a comment